01 / Surfaces

The finish begins underneath.

Painting and plastering work best when the surface is sound. We look at what needs repairing, protecting or replacing before deciding how to finish it.

Painter cutting a clean edge where a wall meets the ceiling
01 / Painting & decorating

Colour, with the preparation it deserves

We protect floors and fittings, fill and sand small defects, prepare the surfaces and apply the agreed finish to walls, ceilings and woodwork. The work can be planned room by room to make a lived-in home or working space easier to manage.

A single room may take a few days; larger spaces are planned in stages. The condition of existing paintwork and the amount of making-good shape the schedule.

Plasterer drawing a trowel across a freshly plastered wall
02 / Plastering

A level surface changes the whole room

We assess cracks, uneven areas and damaged plaster, then prepare and plaster walls or ceilings as the surface requires. Corners and joins receive the same attention as the open wall: they remain visible once the furniture is back.

Small repairs and full-room plastering have different timelines. Fresh plaster needs suitable drying time before decorating begins, so we account for that in the order of work.

Builder positioning plasterboard against interior wall framing
03 / Plasterboard installation

The right base for the next finish

Where a wall or ceiling needs a new lining, we measure, cut and install plasterboard before preparing its joints and surface for plastering or decoration. We look at openings, edges and the existing structure so the board fits the room rather than fighting it.

The installation is followed by surface preparation and drying where plaster is applied; we discuss those stages together when looking at the space.

02 / Materials in place

The details you see every day

A straight edge, an even wall, a floor that meets the doorway cleanly. Small decisions become part of the room.

Painter preparing timber skirting before its final coat
PaintingEdges made clean
Tradesperson checking the seam of fitted plasterboard
PlasterboardReady for the surface
Tiler setting a wall tile against a measured line
TilingSet out with care
Floor fitter laying laminate boards beside a doorway
FlooringFitted to the room
Joiner measuring timber trim against an interior wall
JoineryMeasured on site

Scroll to see the details →

03 / Fitting & installation

Where the surfaces meet

Tiles, boards and timberwork have to work with the dimensions already there. We check the base, set out the work and pay attention to the last cut as well as the first.

Tiler setting out floor tiles in a kitchen
04 / Floor & wall tiling

Laid out before it is laid down

We prepare the base, plan the tile layout around fixtures and edges, fit the tiles and grout the joints. In wet areas, the condition and preparation of the surface matter as much as the visible pattern.

A small area may be completed over several visits to allow for setting and grouting; larger areas depend on the base and tile format.

Installer fitting laminate flooring over underlay
05 / Laminate flooring

A floor fitted to its room

We check the subfloor, fit suitable underlay, lay the boards and finish thresholds and edges neatly. Doorways, existing skirting and the level of the base are considered before fitting starts.

Room size and subfloor condition determine how long installation takes; we assess both during the visit.

Joiner fitting interior timberwork in a residential room
06 / Joinery installation

Timberwork measured in place

We install interior joinery and finishing timberwork, measuring against the actual walls, floors and openings. That helps skirting, trim and other fitted details sit cleanly alongside new plaster, flooring or decoration.

The time on site depends on the pieces being fitted and the amount of adjustment the existing room needs.

04 / The wider work

One room often needs more than one trade.

Property maintenance. We address everyday repairs and worn finishes as part of keeping residential and commercial spaces in good working order. A loose tile, damaged surface or tired section of timberwork can be assessed alongside the surrounding finish.

Residential & commercial refurbishment. For wider work, we look at the rooms together and plan a sensible sequence: repairs and installation first, then the finishes that bring the space back into use. The scope and schedule follow what the property needs, rather than a fixed package.

Decorator repairing a wall beside an interior timber doorway
Residential & commercial · London, UK
Before work begins

Useful things to ask

Can you handle several parts of one refurbishment?

Yes. Painting, plastering, plasterboard, tiling, flooring, joinery and maintenance can be considered together. We look at the property and discuss which work needs to happen first, particularly where a new surface must dry before it can be decorated.

Do I need to prepare the room before painting?

We protect the working area and prepare the surfaces as part of the decorating work. At the visit, we can talk through furniture, access and any items that should be moved so the room is ready when work begins.

How do you work out the timing?

We look at the size and condition of the space, the preparation needed and the order of trades. A single room of decorating may take a few days; plaster drying, tile setting and subfloor work can affect the schedule for a wider project.

Do you work in commercial properties?

Yes. Royal Finish Construction works on residential and commercial properties across London. Tell us how the space is used when arranging a visit, and we can discuss the work and its likely disruption.

05 / The next step

Let’s look at the space as it is.

Tell us about the room, the repair or the wider refurbishment. A visit gives us a chance to assess the surfaces, discuss the finish you have in mind and work out a sensible order for the job.

Residential & commercial · London, UK